WisDOT is replacing the pavement on WIS 16 from East Main Street to just 0.23 miles east of the intersection of WIS 16 and Rock River Road (8.85 miles).
Construction: March 17, 2025 – Late fall 2025
Improvements include:
- Replacement of the existing pavement and base material
- Upgrade of guardrail
- Bridge deck surface repairs
- New roundabout at East Main Street & WIS 16
- Mill and overlay at WIS 16 & County F (American St)